The installation of Tension Leg Offshore Platforms requires a temporary buoy system to support the tendons prior to arrival of the hull structure. Once the tendons are connected to the hull, the buoys can be removed. Recognized as the World Leader.
Tendon Buoys
- Post author:detaildesign
- Post published:November 18, 2012
- Post category:Homepage Slider